Saturday, 28 September 2013

Let the assembly begin

Yesterday my pre-cut aluminium profiles and 90* angle brackets arrived. I ordered these from Boikon and were delivered within a week.


Yesterday evening we immediately started with the assembly of the bridge gantry and the rest of the frame.


This morning my father welded the legs.

And we moved the everything to my attic for assembly. This is still temporarily because I need to paint the frame; all the legs and welds are still bare metal.

No comments:

Post a Comment